“House-building combine”

At the opening of the enterprise, Bakytzhan Sagintayev heard a report on construction of a house-building factory in Aktobe and familiarized himself with the technological process of…

TAS Global Trading LLP

Created a Joint Venture – TAS Global Trading LLP (SPK share – 9.9%) Sand mining at the Dzhaksymayskoe deposit in the Temir district Contract dated 03.05.2018

Koktas Mining LLP

Created a Joint Venture – Koktas Mining LLP (SPK share – 20%) Exploration of building stone on the manifestation of Sartau-5 in the Mugalzharsky district Contract dated…

“Diabaz-NT” LLP

Created a Joint Venture – Diabaz-NT LLP (SPK share – 20%) Exploration of building stone on the manifestation of Berchegur-9 in Shalkar region Contract dated 06.02.2018

“TasTau Co” LLP

Created a Joint Venture – TasTau Co LLP (SPK share – 10%) Extraction of building stone at the Shandashinskoe deposit in the Khromtau district Contract dated 06.02.2018…

“Aktobe Inert Materials Company” LLP

Created a Joint Venture – Aktobe Inert Materials Company LLP (SPK share – 20%) Extraction of building stone at the Berchegurskoe-7 deposit in Shalkar region Contract dated…

“BTA-Invest” LLP

Created a Joint Venture – BTA-Invest LLP (SPK share – 20%) Exploration of a building stone (diabase) on the manifestation of Ashchilisay in Kargaly region Contract dated…

“PGS Bestamak” LLP

A Joint Venture was established – PGS Bestamak LLP (SPK share – 20%). Exploration of sand on the manifestation of Bestamak in Alga district. Contract dated 07.14.2017…

“SP HERMES” LLP

A joint venture was created – JV Hermes LLP (SЕC share – 20%). Sand mining at the Zharlysayskoe deposit in Temir district Contract dated July 25, 2016…

“PGS-Saryzhan” LLP

A joint venture was created – PGS-Saryzhan LLP (SPK share – 20%). Exploration of sand and gravel on the manifestation of Khlebodarov-4 Contract dated 08.11.2016 Cost: 5.6…

“TAS-Kargaly LLP

Created a Joint Venture – TAS-Kargaly LLP Extraction of building stone at the Kuagash deposit in the Kargaly region Contract dated 01.23.2015 Cost: 200 million tenge Reserves:…

«VERMICULITE KZ» LLP

Created a Joint Venture – «VERMICULITE KZ» LLP Vermiculite mining at the Altyntasskoye field. Contract dated 06.02.2015 Cost: 219 million tenge Reserves: 6.7 million tons

“Aktobe Ken” LLP

Created a Joint Venture – Aktobe Ken LLP (SPK share – 9.9%) Gold mining at the Zhilanda deposit (Contract dated 04.10.2010). The aim of the project: the…

“Batys Kaliy” LLP

A joint venture was created – Batys Kaliy LLP (SPK share – 5%). Exploration and mining of potassium-magnesium salts at the Zhilyan deposit (Contract dated 12.12.2008). The…

Sand extraction at Jaximai may in temir district

Contract dated 03.05.2018 Created by TAS Global Trading LLP (SPK share – 9.9%).

Exploration of construction stone on Sartau-5 manifestation in Mugalzhar district

Contract dated 09/04/2018 Created by – Koktas Mining LLP (SEC share – 20%).

Exploration of construction stone on the expression of Berchegur-9 in Shalkar district

Contract dated 06.02.2018 Created by – Diabaz-NT LLP (SEC share – 20%).

Mining of construction stone at Shandashin field in Chromtau district

Contract dated 06.02.2018 Investment – 958.5 million tenge. Created – JV – TasTau Co LLP (SPK share – 10%).

Mining of construction stone at Berchegur-7 deposit in Shalkar district

Contract dated 11.27.2017 Created by JV – Aktobe Inert Materials Company LLP (SPK share – 20%).

Exploration of construction stone (diabaz) on the manifestation Ashchilisay in Kargaly district

Contract dated 10.06.2017 Created by – BTA-Invest LLP (SEC share – 20%).

Exploration of sand on the management of Bbestamak in Alga district

Contract dated 07.14.2017 Created by – JV “PGS Bestamak” LLP (SPK share – 20%).

Sand extraction at the deposit of Jarlesay in Temir district

Contract dated July 25, 2016 Investments – 363.6 million tenge. Created by – SP-LLP “SP Hermes” (The share of SEC – 20%). Investments in the project –…

Exploration of sandy-gravel mixture on appearance of Khlebodarov-4

Contract dated 08.11.2016 Investments – 5.6 million tenge. Created by – SPG-LLP “PGS-Saryzhan” (SPK share – 20%).

Mining of construction stone at Kuagash field in Kargaly district

Contract dated 01.23.2015 Created – JV – TAS-Kargaly LLP (SPK share – 25%). Reserves – 8.5 million m3. Investments – 200 million tenge.

Production of gold at field of Zhilandy

Contract dated 04. 10. 2010 A joint venture, Aktobe Ken LLP, was established to develop the field (SPK’s share is 9.9%). Investments in Zhilandy metro station –…

Exploration and extraction of potassium-magnesium salts at the of Zhilyan

Contract from 12. 12. 2008 Joint venture was created – Batys Kaliy LLP (SPK share – 5%). Investments in Zhilyanskoe metro station – 160.7 billion tenge. The…

“Zhedel Plus” LLP

Zhedel Plus LLP – Production of three-layer wall blocks. Products – fin blocks with elements of the facade, insulation. Cost – 935 million tenge. Capacity – up…

“Polivest” LLP

Polivest LLP – Production of plastic bags Products – T-shirt type, packing bags, garbage bags Cost – 500 million tenge Power – 1200 tons Production commissioning –…

“Aktobe TOPSA Plast” LLP

Aktobe TOPSA Plast LLP – Production of antifreeze and other solvents and chemical reagents Cost – 200 million tenge Capacity – 1 million liters of windshield fluid…

“Talan Technology” LLP

Talan Technology LLP – Production of top-quality safety coatings using innovative technologies. Products – children’s crumb rubber towns, flooring / tile, flooring for school gyms and tennis…

“Aktobe greenhouse”

The capacity of complex is 1.5 thousand tons of products per year. Cucumbers and tomatoes are grown on three hectares using Dutch technology. The company supplies its…